Stadler SystecProject consultation
Leitstelle im Betrieb – STADLER SYSTEC

Utilities in transition. Control centres at their limit.

Rising demands, more complex systems and new regulatory requirements present major challenges for utilities. We plan, integrate and modernise control centres that remain clear, manageable and adaptable in everyday operation.

Energy
Grids, supply and generation
Water & Wastewater
Plants, facilities and networks
Transport
Mobility and operational control
Uns vertrauen u. a.
TransnetBWIqonySiemens EnergyNTTAWSLufthansaAirbusMTU Aero EnginesBioNTechFerreroPorscheEuropa-ParkKMW

Your perspective

Whose perspective are you considering?

Choose your role. We show you what matters to you and where to start on this page.

What matters to you as an operator

  • Fewer input devices and clearer operation
  • Ergonomics, lighting and acoustics in shift operation
  • Fast access, even under pressure

Your route through this page

The reality in many control centres

Your control centre is growing. Is your overview keeping pace?

Over the years, new applications, systems and monitors are added. Individual upgrades may make sense, but together they often create a complex, heterogeneous working environment.

More and more monitors

Different sizes, resolutions and brightness levels make a consistent overview more difficult.

Too many input devices

Separate clients, keyboards and mice make navigation and operation unnecessarily complex.

Accumulated standalone solutions

Information is distributed across different systems instead of being brought together in a meaningful way.

Outdated components

End of life, end of service and unavailable spare parts create risks that are difficult to calculate.

Difficult working conditions

Outdated lighting, disruptive acoustics and inadequate ergonomics put pressure on shift operation.

Repairing instead of modernising

Individual measures cannot replace a structured assessment of the entire control room.

What works today can become an operational risk tomorrow

The risks are closer than you think.

When a control centre is expanded only in isolated areas, effort and technical dependencies increase. This can affect availability, decision-making, cost efficiency and employee satisfaction.

01

Operational reliability

Risk of failure and longer recovery times.

02

Operation

Lack of clarity and potential operating errors.

03

Technology & Lifecycle

Support ending and spare parts becoming unavailable.

04

Cost efficiency

Unplanned replacement investment and downtime risks.

05

Cybersecurity & Resilience

Unclear dependencies and untested fallback procedures.

06

People

Workload, employee retention and recruitment.

Your quick starting point

Control centre check

How well is your control centre really positioned today?

Answer six short questions on technology and lifecycle, resilience, and people and working methods. You will immediately receive an initial, non-binding self-assessment.

  • 6 questionsIn 3 areas
  • Immediate evaluationResults straight afterwards
  • No personal data entryAnonymous, no registration
  • Free of chargeNon-binding self-assessment
Question 1 of 61 / 6

Technology & Lifecycle

Do you know the lifecycle and support status of your critical components?

BackBack

Your initial guidance

Potential areas for action

This self-assessment does not replace a technical security or compliance review.

Technology & LifecycleReview several topicsReview several topics
Resilience & RedundancyReview several topicsReview several topics
People & Working MethodsReview several topicsReview several topics

Our recommendation

Phase Optimise – Improve Existing Systems

Several areas need attention. A structured modernisation review shows what can remain, what should be renewed and in which order.

In der NEXUS-Box ansehen

Your answers are evaluated only locally in your browser and are not transmitted.

Understand the requirements

New requirements. Clear responsibility.

Critical infrastructure requirements, NIS2 and ISMS place a greater focus on information security, risk management and operational resilience. The control centre's technical dependencies should therefore be deliberately included in the overall risk assessment.

Critical infrastructure · NIS2 · ISMS

What does this mean for the control room?

Regulations may impose different requirements depending on the operator and application. Relevant considerations include traceable system architectures, risk assessments, documented operating procedures and recoverability.

A modernised control centre can support technical and organisational measures. It does not automatically demonstrate legal compliance.

Refit instead of complete replacement

Make good use of existing systems. Renew where needed.

Not every control centre needs a complete rebuild. A planned refit assesses existing components, interfaces, lifecycles and ergonomic shortcomings.

The result can be phased modernisation, with a migration and fallback strategy that takes ongoing operational requirements into account.

Benefits for everyone involved in decisions

One complete system. Different responsibilities. Shared benefits.

Choose your perspective and discover which improvements could matter for your responsibilities.

Operator am Leitstellenarbeitsplatz

Your perspective

Benefits for operators

  • Fewer keyboards, mice and disconnected workflows
  • Faster access to relevant information
  • Intuitive operation in stressful situations
  • Better ergonomics, lighting and acoustics
  • Less strain during shift operation

Stadler Systec NEXUS Box

Your processes. Our box. The perfect connection.

The individual starting point for your workflow

You know something needs to change –
but you are not sure where to start?

Not every project starts with a tender. Select your project phase and the NEXUS Box will show you the right starting point for working together.

Phase 03 / 06

Optimise – improve existing systems

Your control centre is already in operation. We make it ready for the future, step by step, efficiently and with minimal disruption.

Services in this phase

Komplett-Refit
Erweiterung
Technologie-Upgrade
Verfügbarkeit erhöhen
Zukunftssicherheit herstellen
Schrittweise modernisieren
  • Analysis of the current situation
  • Individual modernisation strategy
  • Minimal operational interruption
Modernisierungs-Check vereinbaren
Ca. 30 Minuten
Wahlweise per Telefon oder Teams-Session

Experience that builds trust

Success from our customers' perspective.

Operators of critical infrastructure report on real projects, from planning and renewal during ongoing operation to 24/7 use.

Leitwarte MainovaMainova · Energie
“We really appreciated always having one dedicated contact at STADLER SYSTEC. Because everything from planning and manufacturing to integration and service comes from a single source, we could concentrate on what mattered and now enjoy our innovative control room, which we are completely happy with.”
Reiner Peters
Project manager · KEP
Case study (PDF)
Leitwarte im MHKW MainzEGM · MHKW
“Renewing the control room at the Mainz waste-to-energy plant under considerable time pressure was far from straightforward. This made the precise, reliable and solution-focused work by Stadler all the more impressive. At every stage, we felt that they were delivering more than technology: they were taking responsibility.”
Johannes Schirner
Project manager KMW · Entsorgungsgesellschaft Mainz
Case study (PDF)

Start a conversation

Do you know where your control centre stands today?

Whether you need initial guidance, a specific refit or a planned project, let us explore the next step together.

Request a project consultation

Weitere Angabenoptional

Thank you for your message.

Your enquiry has been submitted. We will be in touch.

Your enquiry could not be sent. Please try again or contact us by phone.